Construct New Energy Center

As part of St. Luke’s Hospitals master plan implementation, a new energy center combined with a multi-level parking garage addition was designed by Bancroft. The parking structure utilized the existing adjacent garage for vehicular circulation and included an energy center on the bottom two floors of the new garage structure. As part of the energy center installation, a new cast in place concrete cooling tower was constructed on the top level of the existing employee garage. This increased the gravity loads as well as the seismic loads on the existing parking structure. The garage was analyzed and the new cooling tower, now eight stories above ground level was designed within the limitations of the structural capacity of the existing parking garage.

Client

St. Luke’s Medical System

Location

Kansas City, MO

Size

82,000 SF

Cost

$54,000,000

Dates

Construction - 2011

Bancroft Services

Structural Engineering

Bancroft Services

ACI/Boland, Inc - Architecture

Contractor

JE Dunn Construction

Previous
Previous

Upgrade Mechanical Systems / Renovate Interior

Next
Next

Renovate for Outpatient Mental Health